STEM Box
  • Introduction
  • Safety
  • Notes Before Beginning
  • Instructions Steps 1 - 13
  • Installing the motors
  • Installing the ESC
  • Installing the flight controller
  • Installing the LED
  • Installing the GPS
  • To finish the build
  • Software Installation
  • Setting up the flight controller
  • When ready to fly
  • Way Point Module (Optional)
  • Compass Calibration
  • Pre-flight
  • Motor start - first flight
Powered by GitBook
On this page

Was this helpful?

Installing the GPS

PreviousInstalling the LEDNextTo finish the build

Last updated 5 years ago

Was this helpful?

Step 28: Using sticky pad, mount the GPS to the center, front end of the box with the orange arrow pointing forward. The GPS wire comes up through the same hole that the LED came through and should be plugged into the EXP on the NAZA light. For the NAZA V2 (yellow), a GPS wire plugs into the GPS slot on the PMU, while the EXP wire on the PMU is the plugged into the EXP slot on the NAZA V2.