To finish the build

Step 29: Ziptie the ESC and motor wires securely to the arms and legs of the drone. Pull any excess wire into the box prior to ziptying to ensure th

at propellers do not cause harm to the wires. Trim the zipties.

Step 30: For battery placement, install one side of the Velcro to the wooded support slat at the back of the drone (closest to the LED) on the inside of the box.

Step 31:

A. To install the receiver (note that pictures may be a different receiver) for the handheld controller connect the wire to the receiver and the X2 position on the NAZA.

B. Use a sticky pad to mount the inside bottom of the box on the left hand side. One of the receiver wires should run towards the back of the aircraft while the other should run across the front.

C. To better secure these wires and prevent interference on the receiver, thread receiver wires under wooden support slats.

D. Lid screw to secure the internal components of the drone will be installed prior to flight. E. Drone components are now assembled and it’s time to go through NAZA setup.

Last updated